跳至内容
Batchtec
  • 首页
  • 新闻
  • 关于我们
  • 产品
  • 售后服务
  • 项目案例
  • 职业生涯
  • 全球办事处
  • 经销商
  • 联系我们
  • 简体中文 English (UK) Bahasa Indonesia Filipino
  • 联系我们
Batchtec
      • 首页
      • 新闻
      • 关于我们
      • 产品
      • 售后服务
      • 项目案例
      • 职业生涯
      • 全球办事处
      • 经销商
      • 联系我们
    • 简体中文 English (UK) Bahasa Indonesia Filipino
    • 联系我们

    Batchtec's Integral Role In The Johor Bahru – Singapore Rapid Transit System (RTS) Link

    11 December 2023
    2023年12月10日 由
    Aaron Chan

    Singapore: In an era where seamless connectivity is paramount, the collaboration between Singapore and Malaysia in establishing a high-speed railway link marks a significant milestone in regional transportation. 

    The Johor Bahru - Singapore Rapid Transit System (RTS) Link aims to connect Bukit Chagar in Johor Bahru city to Woodlands in Singapore via a railway shuttle link approximately 4 kilometres in length, serving about 10,000 passengers per hour each way to help ease traffic congestion on the Causeway. 

    Alignment Map of RTS Link between Johor Bahru (left) and Singapore (right)
    Image Source: MRT Corp


    Batchtec is proud to be at the forefront of this transformative project.  The RTS Link demands state-of-the-art machinery capable of delivering exceptional performance, reliability, and efficiency and our company rose to the occasion, providing a horizontal twin plant with two production lines that not only met but exceeded the stringent quality and output requirements of this ambitious project, leveraging on cutting-edge technology to precisely mix and produce concrete with the optimal blend of strength, durability, and workability.

    RTS Progress (Singapore side) as of December 2023​ ​


    The installation of this plant also posed a unique challenge due to its proximity to a prominent tertiary institution. Understanding the importance of maintaining a tranquil and dust-free environment for our neighbours, especially in an academic setting, we have implemented comprehensive mitigation strategies. 

    Cutting edge barriers and soundproofing measures have been installed at the plant and at key points along the construction site perimeter to minimize the impact of noise and dust on the tertiary institution.


    Batchtec Horizontal Twin Plant located near the RTS Project Site


    As the trains start to race between Singapore and Malaysia, our machinery will continue to be the backbone of this monumental project, symbolizing the power of collaboration, innovation, and a shared commitment to progress.


    在 最新消息
    # Editorial Singapore Wet-Mix Batching Plants
    分析这篇文章
    Breaking Boundaries: A New Era Begins with Our New ECO Series
    15 November 2023

    社交媒体
    ​  ​

      Batch Technologies © 2024. 版权所有。 |隐私政策

    加入我们公司

    职业生涯
    ​
    工作体验
    
    职位空缺
    

    产品与服务

    产品
    售后服务
    项目案例

    公司

    最新消息
    关于我们
    全球布局
    经销商

    全球总部

    52 Senoko Road,
    Singapore 758116
    电话: +65 6265 7119
    传真: +65 6265 9302
    Email: enquiry@batchtec.com.sg

    ​

    我们使用 cookie 为你提供更好的网站使用体验。 Cookie 政策

    只有必需品 同意